Every Batch is Proved Before It is Packed
Dielectric withstand
Every finished assembly is stressed at 5 kV AC for sixty seconds. No breakdown, no flashover across the insulation.
What does "lifetime access" exactly mean?
Rated current run continuously for eight hours; terminal rise must stay within 50 K of ambient.
Insertion durability
10,000 mechanical mate-and-unmate cycles on one connector, then the dielectric test repeated.
Latch retention
More than 500 N of pull force on the locking latch, so a cable cannot be dragged out under load.
Salt spray
480 hours of neutral salt spray, with no red rust on contacts or shell.
Ingress protection
IP55 dust and water-jet test on the assembled connector, not on a bare housing.
≥ 500 MΩ at 1000 V DC, measured before and after the humidity soak.
Insulation resistance
Thermal cycling
IP55 dust and water-jet test on the assembled connector, not on a bare housing.
IEC 62196-3 · 100%
IEC 62196-3 · PER BATCH
IEC 62196-1
INTERNAL SPEC
ISO 9227
IEC 60529
IEC 62196-1
INTERNAL SPEC
A cable or an adapter is a safety component. When one fails, it fails at 200 A on a public charger — and the recall lands on whoever's name is printed on the box. So we test to the clauses that actually cause failures, keep the records, and ship them with the goods instead of producing them on request.