Operating Scenario | Typical Cause | Operational Challenge |
LNG Loading & Unloading | Pipeline cooldown and cargo transfer | Short-term high BOG generation |
Storage Operations | Ambient heat ingress into storage tanks | Continuous vapor accumulation |
Emergency Venting | Equipment malfunction or overpressure conditions | Sudden large-volume gas release |
Maintenance & Purging | Nitrogen purging and commissioning activities | Disposal of combustible gas mixtures |
LNG/LPG Bunkering | Vessel fueling operations | Rapid fluctuations in vapor generation |
Module | Function |
Flare Burner System | High-efficiency combustion of LNG/LPG vapors |
Pilot Burner System | Continuous ignition source |
Air Supply System | Natural draft and forced-air combustion support |
Safety Protection System | Multi-layer safety barriers and interlocks |
PLC Control System | Automated operation and monitoring |
Ignition System | Reliable startup and flame stabilization |
Instrumentation Package | Real-time process monitoring |
Feature | Benefit |
Automatic burner staging | Matches combustion capacity to gas flow |
PLC-based control | Stable operation across varying conditions |
Dynamic load adjustment | Prevents over- or under-firing |
Wide turndown capability | Efficient operation from low to peak loads |
Feature | Benefit |
Natural draft combustion | Reduced energy consumption |
Forced-air assistance | Stable flame under changing conditions |
High-temperature combustion | Improved methane destruction efficiency |
Wind-resistant design | Reliable outdoor operation |
Feature | Benefit |
Dedicated pilot flame | Reliable ignition source |
Continuous monitoring | Reduced flameout risk |
Automatic re-ignition capability | Enhanced operational reliability |
Suitable for variable gas compositions | Stable combustion performance |
Component | Material / Design Solution |
Process Piping | Cryogenic-grade materials |
Valves | Low-temperature-rated assemblies |
Flame Arrestors | Cryogenic-compatible construction |
Sealing Elements | Specialized low-temperature elastomers |
Structural Components | Austenitic stainless steel and alloy steel |
Safety Systems | Verified for cryogenic operation |
Safety Function | Purpose |
Flame Arrestor | Prevent flashback |
Flame Detection System | Continuous flame monitoring |
Pilot Flame Verification | Ensure ignition readiness |
High-Pressure Protection | Prevent overpressure conditions |
Emergency Shutdown (ESD) | Rapid system isolation |
Ignition Failure Protection | Safe startup sequence |
Nitrogen Purging System | Minimize combustible mixtures |
PLC Safety Interlocks | Automated protective actions |
Potential Hazard | Protection Strategy |
Flashback Explosion | Flame arrestor system |
Uncontrolled Methane Release | Continuous monitoring and shutdown logic |
Burner Flameout | Pilot burner and flame detection |
Pressure Surges | Pressure protection devices |
Combustion Instability | Automated burner staging |
Function | Description |
Automatic Operation | Fully automated unattended operation |
Manual Control Mode | Operator-controlled operation during maintenance or testing |
Burner Load Management | Real-time combustion adjustment |
Remote Monitoring | SCADA/DCS integration available |
Alarm Management | Automatic fault notification |
Data Logging | Operational history recording |
Conventional Fixed Flare | ZeXuan Skid-Mounted Flare |
Months of installation work | Deployment within hours |
Requires civil construction | Minimal site preparation |
Permanent installation | Relocatable solution |
Extensive field commissioning | Factory-tested before shipment |
High installation cost | Reduced project cost |
Test Item | Verification |
Burner Ignition Test | Reliable startup |
Flame Detection Test | Response verification |
Safety Interlock Test | Protection system functionality |
ESD Test | Emergency shutdown performance |
PLC Logic Simulation | Control sequence validation |
Leak Tightness Test | System integrity verification |
Cryogenic Compatibility Check | Low-temperature suitability |
Industry Segment | Application |
LNG Receiving Terminals | BOG disposal during unloading and storage |
LNG Bunkering Facilities | Vapor management during vessel fueling |
LPG Storage Terminals | Pressure relief and vapor disposal |
Peak Shaving Plants | Tank pressure control |
Satellite LNG Stations | Routine vapor management |
FSRU Facilities | Offshore BOG handling |
Maintenance Shutdowns | Temporary flare capacity |
Terminal Expansions | Interim vapor disposal solution |
Benefit | Value |
Skid-Mounted Design | Fast installation and relocation |
LNG/LPG Compatible | Broad application flexibility |
Cryogenic Ready | Reliable operation down to -160°C |
High Destruction Efficiency | >99% methane reduction |
Automated Operation | Reduced labor requirements |
Multi-Layer Safety Protection | Enhanced operational safety |
Remote Monitoring | Improved asset visibility |
Factory-Tested System | Faster commissioning |